01
Controlled Filling for Material Soundness
The metal is introduced slowly under controlled pressure to progressively fill the cavity. This approach limits turbulence and aims for good material integrity for structural or functional parts.
02
Process Principle
- 1Liquid aluminum is held in the furnace.
- 2Controlled pressure pushes the metal into the riser tube.
- 3The mold cavity fills progressively.
- 4The part solidifies before mold opening and finishing.
03
Applications and Decision Points
- Structural and functional parts.
- Casings and pump bodies.
- Components with high mechanical requirements.
- Parts with a specified leak-tightness in the specifications.
Leak-tightness or radiographic inspections can be considered as associated services depending on the project and its level of requirement.
04
Request a quoteLet's Prepare Your Project
Tell us about your part: send us your plan or 3D file, the estimated quantity, the alloy, the expected complementary operations, and your deadline objective. Our teams will study the most suitable process for your project.



